Today was our final walk-through and we also had part II of our private home inspection. The final walk-through was a lot of fun and very informative. Our PM, Mike took time to show us the paperwork that goes along with our house (warranties, important numbers, etc) and he talked to us about maintanence items we need to take care of - sealing the grout, concrete, etc.
Once that was done we took a tour of the house and snapped a lot of pictures. We ended the appointment with part II of our private home inspection and I just received the report. There were a few, very minor items our inspector found and I suspect Ryan Homes will be able to take care of them before we move in.
Here are the pictures of the finished product, but there are no exterior pictures as that is still a work in progress. Due to the cold NE Ohio weather, we will not have a driveway or sidewalk until the end of May and some exterior painting will have to wait as well. The lawn and landscaping will not be installed until August or September.
We failed to take pictures of our finished basement but it looks great.
Dining room - I think the light fixture is about 6" too low
Mud room
If you are building a Dunkirk, RH's can install hardwood stairs